In order to begin the work with the Modus system you have to reflect in the system the production process performed in the company. To do this, it is necessary to define, among others:
- what type of a product will be made (group of products - simple product/combination product),
- in what way the products are made (production technology),
- what are the components of products (formula).
Step I: Configuration of the program
- choose a group of products - in version Modus Free there are two groups of products available:
- simple produkct (in the formulas of products that belong to this group, there are specific materials and their quantity needed for production);
- combination product - it is defined at the stage of order (in the formulas of products that belong to this group, you can add production groups of materials. Their use can be expressed in variables, mathematical formulas or usage charts. Choice of the material and the value that will be used as a variable/variables take place at the time of placing an order).
For the combination product define Families and Elements.
- define:
- Production groups of materials (it refers to products that are defined at the stage of order)
- materials ( by selecting the production group of materials, if the material will be used in the formulas of products defined at the stage of order)
Watch video presentations!
Comparison of groups of products:
| GROUP OF PRODUCTS | ||
|---|---|---|
| Simple product | Combination product | |
| compatibility of batches | NO | YES, with possibility of change to NO option |
| variants | NO – every product has an individual index card | YES - variants are created during placing an order , according to the chosen materials or variant values |
| formula | In the formula, specific materials and their quantities are defined | A component of formula can be a group of materials. A demand can be expressed in a variable, a mathematical formula or a usage chart |
| assembly/disassembly | Possible | Impossible |
| product as a component of the formula | it can be a component of the formula | it can't be a component of the formula |
| families and elements | exist | they have to be defined |
| price groups | do not exist | they can be defined |
<More information about the groups of products you can find Here.
Below, there are few examples of configuration for different branches:
- branch - production of concrete
++++ Screen: Branch - production of concrete
++++
++++ Screen: Production of concrete - group of products|
++++
++++ Screen: Production of concrete- defining of production technology|
++++
++++ Screen: Production of concrete - defining of technological operations|
++++
++++ Screen: Production of concrete- defining of the stage of production technology |
++++
++++ Screen: Production of concrete - defining of the product's formula |
++++
- branch - production of aluminum corners
++++ Screen: branch - production of aluminum corners|
++++
- branch - production of upholstered furniture
++++ Screen: branch - upholstered furniture|
++++
On the basis of presented examples and information below, configure the system according to your branch.
Watch the whole list video presentations!
Step II: Entering data
- Enter contractors
Step III: Work with the program
- Place an order to a supplier
- Accept an order from a Receiver
- Perform a production process
- Transfer materials necessary for the realization of the commission from the main warehouse into a production warehouse
- Confirm Production commission
- Assign employees to the production commission
- Wykonaj kolejne stages of production
-
Watch video presentations!
Limits of the version Modus Free:
- imposed local work with the base (in the subdirectory /db)
- only one connection to the base is possible;
- 1 user (ADMIN with all the rights);
- 1 workstation;
- 2 groups of products: Simple product and combination product;
- 3 technologies (except assembly);
- 3 warheouses (system ones: Main, Production and Parts Warehouses );
- 2 registers C/B (one related to the cash and the other one to the bank);
- 0 bank accounts of the contractor;
- one printout template of a user for every printout in the system;
- maximally 2 components that can be included in the group of formula;
- lack of the CMMS module;
- MRP planning can be performed maximally for 2 following weeks